Robotics without the rebuild: commissioning in a live warehouse

18 Mar 2027
  • What needs to change in floors, aisles, transfer points or wireless coverage before robots arrive?
  • See how installation zones, phased cutover and fallback routes can limit disruption while orders continue to move
  • Learn how site-readiness checks and staged acceptance verify safe, stable operation alongside existing racking and equipment